Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1018261.015
Citation: 01012
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,800.00
Current Penalty: $1,540.00
Issuance Date: 07/10/2015
Nr Instances: 4
Nr Exposed: 5
Abatement Date:
Gravity: 5
Report ID: 0112000
Contest Date:
Final Order: 07/30/2015
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/30/2015 | $1,540.00 | Serious | ||
| Penalty | Z: Issued | 07/10/2015 | $2,800.00 | Serious |
Text For Citation: 01 Item/Group: 012 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: A. Building 58, Set-up Area: On, or about, January 15, 2015, an extension cord was used to energize a computer kiosk that was used by employees to track orders. B. Building 4, Maintenance Area: On, or about, January 20, 2015 an extension cord was used to energize a light fixture provided over the TCM control panel. C. Building 34, Maintenance Shop: On, or about, February 13, 2015, two extension cords were used to energize overhead lights near the Back Bay door.