Violation Detail
Standard Cited: 19100147 C04 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 810501.015
Citation: 01011B
Citation Type: Serious
Abatement Date: 11/25/2013 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/01/2013
Nr Instances: 1
Nr Exposed: 30
Related Event Code (REC):
Gravity: 10
Report ID: 0627510
Contest Date:
Final Order: 07/24/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/24/2013 | $0.00 | 11/25/2013 | Serious | |
Penalty | Z: Issued | 07/01/2013 | $0.00 | 07/26/2013 | Serious |
Text For Citation: 01 Item/Group: 011B Hazard:
29 CFR 1910.147(c)(4)(i): Procedures were not developed, documented and utilized for the control of potentially hazardous energy when employees were engaged in activities covered by this section: Throughout the facility, employer did not have equipment-specific energy control procedures for the following equipment for activities covered by 1910.147. The lack of documentation of machine-specific energy control procedures expose employees to unexpected struck-by, caught-by and electrical hazards. a) low stage compressor (Comp B-2) in the mechanical room. b) high stage compressor (Comp H-1) in the mechanical room. c) high stage compressor (Comp H-2) in the mechanical room. d) swing compressor (Comp S-1) in the mechanical room. e) evaporative condensers (EC-1&2) throughout the facility. f) fab floor cooler (FF-1 through FLD-2) in the fabrication floor