Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1635521.015
Citation: 01011B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $9,376.00
Current Penalty: $0.00
Issuance Date: 05/18/2023
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 07/07/2023
Gravity: 5
Report ID: 0317000
Contest Date: 06/12/2023
Final Order: 06/01/2024
Related Event Code (REC): C
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 06/01/2024 | $0.00 | 07/07/2023 | Other | |
| Penalty | C: Contested | 06/13/2023 | $9,376.00 | 07/07/2023 | Serious | |
| Penalty | Z: Issued | 05/18/2023 | $9,376.00 | 07/07/2023 | Serious |
Text For Citation: 01 Item/Group: 011B Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: a)Wheels America located at 777 W. Providence Rd. Lansdowne, PA 19050 - Production Area On or about November 22, 2022, the employer did not provide permanent wiring to power multiple LED lighting used to illuminate the work areas. The employer used temporary extension cords throughout the facility to power lights for greater than 90 days in lieu of permanent writing.