Violation Detail
Standard Cited: 19100305 G01 IV D Wiring methods, components, and equipment for general use.
Inspection Nr: 1800683.015
Citation: 01011A
Citation Type: Serious
Abatement Status:
Initial Penalty: $10,641.00
Current Penalty: $9,200.00
Issuance Date: 07/28/2025
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 08/14/2025
Gravity: 5
Report ID: 0627700
Contest Date:
Final Order: 09/02/2025
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/02/2025 | $9,200.00 | 08/14/2025 | Serious | |
Penalty | Z: Issued | 07/28/2025 | $10,641.00 | 08/14/2025 | Serious |
Text For Citation: 01 Item/Group: 011A Hazard:
29 CFR 1910.305(g)(1)(iv)(D): Flexible cords were attached to building surfaces: a.) On or about January 28, 2025 and at times prior, on the north end of building #7, an extension cord was zip-tied to a beam in the facility and used as a substitute for fixed wiring. b.) On or about January 28, 2025 and at times prior, on the west end of building# 1, an extension cord, wrapped around conduit behind/over a beam, was being used as a substitute for fixed wiring and provided power to a microwave in the shop.