Violation Detail
Standard Cited: 19100303 B01 I General.
Inspection Nr: 1682064.015
Citation: 01011A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,250.00
Current Penalty: $4,375.00
Issuance Date: 11/13/2023
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 01/02/2024
Gravity: 5
Report ID: 0522000
Contest Date:
Final Order: 11/16/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/16/2023 | $4,375.00 | 01/02/2024 | Serious | |
Penalty | Z: Issued | 11/13/2023 | $6,250.00 | 01/02/2024 | Serious |
Text For Citation: 01 Item/Group: 011A Hazard:
29 CFR 1910.303(b)(1): Examination. Electric equipment shall be free from recognized hazards that are likely to cause death or serious physical harm to employees. Safety of equipment shall be determined using the following considerations: (i): Suitability for installation and use in conformity with the provisions of this subpart; Note to paragraph (b)(1)(i) of this section: Suitability of equipment for an identified purpose may be evidenced by listing or labeling for that identified purpose. a) On or about August 25, 2023, at Rotary #2 in the Rag Room, the switch to control the rotation of the Rotary and the switch to turn on/off the power to the Rotary were wired using a flexible cable.