Violation Detail
Standard Cited: 19100333 B02 Selection and use of work practices
Inspection Nr: 910135.015
Citation: 01011
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,000.00
Current Penalty: $4,200.00
Issuance Date: 11/07/2013
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/20/2013
Gravity: 10
Report ID: 0626300
Contest Date:
Final Order: 12/26/2013
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 12/26/2013 | $4,200.00 | 11/20/2013 | Serious | |
| Penalty | Z: Issued | 11/07/2013 | $7,000.00 | 11/20/2013 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1910.333(b)(2): While any employee was exposed to contact with parts of fixed electric equipment or circuits which have been deenergized, the circuits energizing the parts were not locked out or tagged or both in accordance with the requirements of this paragraph: The employer does not ensure that parts of fixed electrical equipment or circuits which have been de-energized are locked out or tagged out. This violation was discovered on June 6, 2013, where one (1) employee did not de-energize electric equipment or circuits energizing parts while replacing a ballast without using lockout/tagout procedures on de-energized parts.