Violation Detail
Standard Cited: 19100147 C06 I The control of hazardous energy (lockout/tagout).
Inspection Nr: 445406.015
Citation: 01011
Citation Type: Serious
Abatement Date: 12/14/2012 2
Initial Penalty: $6,300.00
Current Penalty: $6,300.00
Issuance Date: 11/19/2012
Nr Instances: 1
Nr Exposed: 8
Related Event Code (REC): C
Gravity: 10
Report ID: 0213900
Contest Date: 12/05/2012
Final Order: 06/13/2013
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 06/13/2013 | $6,300.00 | 12/14/2012 | Serious | |
Penalty | C: Contested | 12/15/2012 | $6,300.00 | 12/14/2012 | Serious | |
Penalty | Z: Issued | 11/19/2012 | $6,300.00 | 12/14/2012 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1910.147(c)(6)(i): The employer did not conduct a periodic inspection of the energy control procedure at least annually to ensure that the procedure and the requirement of this standard were being followed: a) Facility - The employer did not conduct periodic inspections of the of the energy control procedures at least anually for machines, such as but not limited to the Stamtec GL-200 hydraulic press, Stamtec GL-60 hydraulic press, Minister No. 6 mechanical press, and Autoformer, on or about 5/21/12. NOTE: IN ADDITION TO ABATEMENT CERTIFICATION, THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT DOCUMENTATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.