Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 1667814.015
Citation: 01011
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,277.00
Current Penalty: $1,138.50
Issuance Date: 08/09/2023
Nr Instances: 4
Nr Exposed: 5
Abatement Date:
Gravity: 1
Report ID: 0111100
Contest Date:
Final Order: 09/01/2023
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/01/2023 | $1,138.50 | Serious | ||
Penalty | Z: Issued | 08/09/2023 | $2,277.00 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and/or cables were run through holes in walls, ceilings, or floors. Establishment - The employer has run four power cords through a opening cut in the wall of the small tool shop out to the shipping and packing area for appliances and machines in the shipping area including the drive rollers on a table saw, band saw, and refrigerator.