Violation Detail
Standard Cited: 19100304 B03 I Wiring design and protection.
Inspection Nr: 1608381.015
Citation: 01011
Citation Type: Serious
Abatement Status: Not Completed - Employer Out of Business
Initial Penalty: $11,167.00
Current Penalty: $11,167.00
Issuance Date: 01/12/2023
Nr Instances: 1
Nr Exposed: 33
Abatement Date: 02/23/2023
Gravity: 10
Report ID: 1032100
Contest Date: 02/09/2023
Final Order: 08/07/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 08/07/2023 | $11,167.00 | 02/23/2023 | Serious | |
Penalty | C: Contested | 02/09/2023 | $11,167.00 | 02/23/2023 | Serious | |
Penalty | Z: Issued | 01/12/2023 | $11,167.00 | 02/23/2023 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1910.304(b)(3)(i): All 125-volt, single-phase, 15- and 20-ampere receptacles installed in wet locations were not equipped with ground-fault circuit-interrupter protection for personnel. a) F/V Pacific Producer - On or about July 20, 2022, and times prior thereto, employees used 120 outlet receptacles throughout the vessel which had multiple leaks in roofing, flooring, and was not water-tight. The receptacles installed and used were not GFCI protected exposing employees to electrical hazards.