Violation Detail
Standard Cited: 19261153 C02 II
Inspection Nr: 1497080.015
Citation: 01011
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $4,096.00
Current Penalty: $4,096.00
Issuance Date: 01/20/2021
Nr Instances: 2
Nr Exposed: 3
Abatement Date:
Gravity: 10
Report ID: 0214500
Contest Date:
Final Order: 02/16/2021
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | Z: Issued | 01/20/2021 | $4,096.00 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1926.1153(c)(2)(ii): Water was not applied at flow rates sufficient to minimize release of visible dust for tasks performed using wet methods: a) Building Exterior-back: The employer did not apply water to minimize the release of visible dust while dry cutting a concrete, the employee was exposed to silica dust while dry cutting the back wall with a handheld angle grinder, on or about 10/6/20. b) Building Exterior-back: The employer did not apply water to minimize the release of visible dust while dry cutting a concrete, the employee was exposed to silica dust while dry cutting the back wall with a Husqvarna K770 power cutter , on or about 10/6/20.