Violation Detail
Standard Cited: 19100303 F02 General.
This violation item has been deleted.
Inspection Nr: 1428866.015
Citation: 01011
Citation Type: Serious
Abatement Status:
Initial Penalty: $5,783.00
Current Penalty: $0.00
Issuance Date: 02/28/2020
Nr Instances: 2
Nr Exposed: 4
Abatement Date: 03/25/2020
Gravity: 1
Report ID: 0729700
Contest Date: 03/16/2020
Final Order: 08/17/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/17/2020 | $0.00 | 03/25/2020 | Serious | |
Penalty | C: Contested | 03/17/2020 | $5,783.00 | 03/25/2020 | Serious | |
Penalty | Z: Issued | 02/28/2020 | $5,783.00 | 03/25/2020 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: At the facility two of the ON/OFF safety switch boxes were not labeled to identify the area and equipment/machine which it controls. Employees engaged in repair, replace, inspection and maintenance activities of covered process equipment at the engine room #4 were exposed to electrical shock hazards. 29 CFR 1903.19(c)(1) requires certification that the abatement of the above violation is complete.