Violation Detail
Standard Cited: 19100269 D08 V A Electric Power Generation, Transmission, and Distribution.
Inspection Nr: 1409674.015
Citation: 01011
Citation Type: Serious
Abatement Date: 01/16/2020 2
Initial Penalty: $5,306.00
Current Penalty: $5,306.00
Issuance Date: 11/27/2019
Nr Instances: 1
Nr Exposed: 5
Related Event Code (REC): R
Gravity: 10
Report ID: 1050210
Contest Date:
Final Order: 12/23/2019
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 12/23/2019 | $5,306.00 | 01/16/2020 | Serious | |
Penalty | Z: Issued | 11/27/2019 | $5,306.00 | 01/16/2020 | Serious |