Violation Detail
Standard Cited: 19100305 G02 III Wiring methods, components, and equipment for general use.
Inspection Nr: 1303654.015
Citation: 01011
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $7,760.00
Current Penalty: $3,500.00
Issuance Date: 07/10/2018
Nr Instances: 2
Nr Exposed: 10
Abatement Date: 07/30/2018
Gravity: 5
Report ID: 0317900
Contest Date:
Final Order: 08/01/2018
Related Event Code (REC):
Emphasis:
Substance: 2590
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/01/2018 | $3,500.00 | 07/30/2018 | Serious | |
Penalty | Z: Issued | 07/10/2018 | $7,760.00 | 07/30/2018 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1910.305(g)(2)(iii): Flexible cords and cables were not connected to devices and fittings so that strain relief was provided that would prevent pull from being directly transmitted to joints or terminal screws: a) Atlantic Precast Concrete - On or about March 15, 2018, an employee was mixing flammable paints in the Channel Department utilizing a portable handheld mixer with a power cord that had damaged strain relief, exposing the employee to electrical hazards and burns. b) Atlantic Precast Concrete - On or about March 15, 2018, an employee was mixing flammable paints in the Yard paint area utilizing a portable handheld mixer with a power cord that had damaged strain relief, exposing the employee to electrical hazards and burns. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.