Violation Detail
Standard Cited: 19100303 F02 General.
Inspection Nr: 1288018.015
Citation: 01011
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,880.00
Current Penalty: $2,910.00
Issuance Date: 05/21/2018
Nr Instances: 1
Nr Exposed: 20
Abatement Date: 07/09/2018
Gravity: 1
Report ID: 0111700
Contest Date:
Final Order: 06/15/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/15/2018 | $2,910.00 | 07/09/2018 | Serious | |
Penalty | Z: Issued | 05/21/2018 | $3,880.00 | 07/09/2018 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or overcurrent device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident: Site- Employees were not protected from fire hazards where circuit breakers in panel boards including; but not limited to; LP-1, LP-02, WTPP #1, MPP-1, MPP-2A, PP-1, and PP-3 were not labeled or labeling of circuit breakers was not legible.