Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 1245028.015
Citation: 01011
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,070.00
Current Penalty: $2,711.50
Issuance Date: 12/11/2017
Nr Instances: 2
Nr Exposed: 9
Abatement Date:
Gravity: 10
Report ID: 0524200
Contest Date:
Final Order: 01/05/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/05/2018 | $2,711.50 | Serious | ||
Penalty | Z: Issued | 12/11/2017 | $5,070.00 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: a) Line 4- On or about August 18, 2017, the employer failed to ensure that an effective path to ground was present for the Corona Transformer on Line 4. b) Line 7- On or about August 18, 2017, the employer failed to ensure that an effective path to ground was present for the B Layer Extruder on Line 7. No abatement certification or documentation is required for this item.