Violation Detail
Standard Cited: 19100216 B01 Mills and calenders in the rubber and plastics industries.
Inspection Nr: 1045342.015
Citation: 01011
Citation Type: Serious
Abatement Date: 09/23/2015 2
Initial Penalty: $7,000.00
Current Penalty: $6,000.00
Issuance Date: 08/27/2015
Nr Instances: 1
Nr Exposed: 3
Related Event Code (REC):
Gravity: 10
Report ID: 0418100
Contest Date:
Final Order: 09/17/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/17/2015 | $6,000.00 | 09/23/2015 | Serious | |
Penalty | Z: Issued | 08/27/2015 | $7,000.00 | 09/23/2015 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1910.216(b)(1): An accessible safety trip control that operated on contact was not provided in front and/or back of each mill. Note: The safety trip control shall be one of the types or a combination thereof as listed in 1910.216(b)(1). On or about 3/9/15, in the Plant 1 production area at Line 12, the mill platform was located 4.6' above floor levels and greater than 18 inches away from the pull e-stop cord and from employee reach. In accordance with 29 CFR 1903.19(d), abatement certification is required for this violation (using the CERTIFICATION OF ACTION WORKSHEET), and in addition, documentation demonstrating that abatement is complete must be included with your certification. This documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or other written records.