Violation Detail
Standard Cited: 19100305 G01 IV D Wiring methods, components, and equipment for general use.
Inspection Nr: 1016847.015
Citation: 01011
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $3,000.00
Current Penalty: $2,100.00
Issuance Date: 02/12/2015
Nr Instances: 2
Nr Exposed: 5
Abatement Date: 03/11/2015
Gravity:
Report ID: 0936200
Contest Date:
Final Order: 03/02/2015
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/02/2015 | $2,100.00 | 03/11/2015 | Other | |
Penalty | Z: Issued | 02/12/2015 | $3,000.00 | 03/11/2015 | Serious |
Text For Citation: 01 Item/Group: 011 Hazard:
29 CFR 1910.305(g)(1)(iv)(D): Flexible cords and cables were attached to building surfaces: (a) Bldg. 660, Bay 1, Raw Stock Area: a flexible cord was wrapped around electric conduit on the wall. (b) Bldg. 658, Bay 3, a flexible cord was fastened to the wall with metal clips.