Violation Detail
Standard Cited: 19100110 C06 III Storage and handling of liquefied petroleum gases.
Inspection Nr: 998870.015
Citation: 01010D
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 03/17/2015
Nr Instances: 1
Nr Exposed: 4
Related Event Code (REC):
Gravity: 5
Report ID: 0627700
Contest Date:
Final Order: 04/14/2015
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 04/14/2015 | $0.00 | Serious | ||
Penalty | Z: Issued | 03/17/2015 | $0.00 | Serious |
Text For Citation: 01 Item/Group: 010D Hazard:
29 CFR 1910.110(c)(6)(iii): Valves and connections to the containers were not protected while in transit, in storage, and while being moved into final utilization, as follows (a) - (b): a. On or about October 15, 2014, at the west side of the paint building, a non-recessed valve of a propane cylinder did not have a valve cap or collar and was not protected from damage which exposes employees to fire and explosion hazards.