Violation Detail
Standard Cited: 19100178 L03 I G Powered industrial trucks.
Inspection Nr: 414289.015
Citation: 01010C
Citation Type: Serious
Abatement Date: 12/31/2012 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 10/29/2012
Nr Instances: 2
Nr Exposed: 3
Related Event Code (REC):
Gravity: 5
Report ID: 0336000
Contest Date: 11/23/2012
Final Order: 11/30/2012
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | P: Petition to Mod Abatement | $0.00 | 12/31/2012 | Serious | ||
Penalty | C: Contested | 01/31/2013 | $0.00 | 11/20/2012 | Serious | |
Penalty | F: Formal Settlement | 11/30/2012 | $0.00 | 12/31/2012 | Serious | |
Penalty | Z: Issued | 10/29/2012 | $0.00 | 11/20/2012 | Serious |
Text For Citation: 01 Item/Group: 010C Hazard:
29 CFR 1910.178(l)(3)(i)(G): Powered industrial truck operators did not receive initial training on fork and attachment adaptation, operation, and use limitations A.) Vortex Recycling On or about 8/29/12 and at times prior thereto, personnel operate Yale forklifts with forklift attachments. These attachments included man basket lift platform, elevated man basket lift platform (1220 PDB), and a jib boom style attachment. Company has not performed any special attachment training. B.) Vortex Recycling On or about 8/29/12 and at times prior thereto, personnel operate Hyster forklifts with forklift attachments. These attachments included man basket lift platform, elevated man basket lift platform (1220 PDB), and a jib boom style attachment. Company has not performed any special attachment training.