Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 1308095.015
Citation: 01010B
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 09/21/2018
Nr Instances: 1
Nr Exposed: 5
Abatement Date: 10/25/2018
Gravity: 5
Report ID: 0316700
Contest Date: 10/12/2018
Final Order: 01/09/2019
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | F: Formal Settlement | 01/09/2019 | $0.00 | 10/25/2018 | Serious | |
| Penalty | C: Contested | 10/15/2018 | $0.00 | 10/25/2018 | Serious | |
| Penalty | Z: Issued | 09/21/2018 | $0.00 | 10/25/2018 | Serious |
Text For Citation: 01 Item/Group: 010B Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and cables were run through holes in walls, ceilings, or floors: a) Welding and grinding - Extension cords powering the dust collector were run through a hole in the wall on or about April 11, 2018. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states employees and their representatives were informed of this abatement.