Powered by GoogleTranslate

Violation Detail

Standard Cited: 19100303 F02 General.

Inspection Nr: 705259.015

Citation: 01010A

Citation Type: Serious

Abatement Status: Abatement Completed

Initial Penalty: $5,000.00

Current Penalty: $5,000.00

Issuance Date: 04/16/2013

Nr Instances: 3

Nr Exposed: 12

Abatement Date: 05/03/2013

Gravity: 5

Report ID: 0936300

Contest Date:

Final Order: 05/06/2013

Related Event Code (REC):

Emphasis:


Penalty and Failure to Abate Event History
Type Latest Event Event Date Penalty Abatement Due Date Citation Type Failure to Abate Inspection
Penalty I: Informal Settlement 05/06/2013 $5,000.00 05/03/2013 Serious  
Penalty Z: Issued 04/16/2013 $5,000.00 05/03/2013 Serious  

Text For Citation: 01 Item/Group: 010A Hazard:

29 CFR 1910.303(f)(2): Each service, feeder, and branch circuit, at its disconnecting means or over-current device, was not legibly marked to indicate its purpose, nor located and arranged so the purpose was evident. On or about January 18, 2013, all disconnecting means or over-current devices on the electrical panels on the West and North walls of the Parts Warehouse and Rebuild Shop were not legibly marked to indicate their purpose when the purpose was not evident.

Thank You for Visiting Our Website

You are exiting the Department of Labor's Web server.

The Department of Labor does not endorse, takes no responsibility for, and exercises no control over the linked organization or its views, or contents, nor does it vouch for the accuracy or accessibility of the information contained on the destination server. The Department of Labor also cannot authorize the use of copyrighted materials contained in linked Web sites. Users must request such authorization from the sponsor of the linked Web site. Thank you for visiting our site. Please click the button below to continue.

Close