Violation Detail
Standard Cited: 19100184 E01 Slings.
Inspection Nr: 1303654.015
Citation: 01010A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,880.00
Current Penalty: $1,500.00
Issuance Date: 07/10/2018
Nr Instances: 2
Nr Exposed: 3
Abatement Date: 07/30/2018
Gravity: 1
Report ID: 0317900
Contest Date:
Final Order: 08/01/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/01/2018 | $1,500.00 | 07/30/2018 | Serious | |
Penalty | Z: Issued | 07/10/2018 | $3,880.00 | 07/30/2018 | Serious |
Text For Citation: 01 Item/Group: 010A Hazard:
29 CFR 1910.184(e)(1): Alloy steel chain slings did not have permanently affixed durable identification stating size, grade, rated capacity, and reach: a) Atlantic Concrete Precast - Base Side Dept - On or about March 20, 2018, a Crane Operator was using an overhead crane for lifting concrete forms with a chain that did not have identification indicating the size, grade, and rated capacity, exposing the employee to struck-by hazards. b) Atlantic Concrete Precast - Frame Dept - On or about March 20, 2018, a Crane Operator was using an overhead crane for lifting concrete structures with a chain that did not have identification indicating the size, grade, and rated capacity, exposing the employee to struck-by hazards. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.