Violation Detail
Standard Cited: 19100303 C03 I General.
Inspection Nr: 1293518.015
Citation: 01010A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $3,696.00
Current Penalty: $6,000.00
Issuance Date: 05/10/2018
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 06/06/2018
Gravity: 5
Report ID: 0626300
Contest Date:
Final Order: 05/30/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 05/30/2018 | $6,000.00 | 06/06/2018 | Serious | |
Penalty | Z: Issued | 05/10/2018 | $3,696.00 | 06/06/2018 | Serious |
Text For Citation: 01 Item/Group: 010A Hazard:
29 CFR 1910.303(c)(3)(i): All splices and joints and the free ends of the conductors were not covered with an insulation equivalent to that of the conductors or with an insulating device identified for the purpose: (a) Main office area, conductors were not covered with equivalent insulation after being spliced. Employees were exposed to electrical hazards. (b) Cutting area, conductors on the 3-head Morgan trim saw conveyor system were not covered with equivalent insulation after being spliced. Employees were exposed to electrical hazards.