Violation Detail
Standard Cited: 19260062 D02 V E Lead
This violation item has been deleted.
Inspection Nr: 1288638.015
Citation: 01010A
Citation Type: Serious
Abatement Status:
Initial Penalty: $9,239.00
Current Penalty: $0.00
Issuance Date: 07/17/2018
Nr Instances: 1
Nr Exposed: 3
Abatement Date: 08/03/2018
Gravity: 5
Report ID: 0317000
Contest Date: 07/27/2018
Final Order: 02/19/2019
Related Event Code (REC): R
Emphasis:
Substance: BWPB
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 02/19/2019 | $0.00 | 08/03/2018 | Serious | |
Penalty | C: Contested | 09/11/2018 | $9,239.00 | 08/03/2018 | Serious | |
Penalty | Z: Issued | 07/17/2018 | $9,239.00 | 08/03/2018 | Serious |
Text For Citation: 01 Item/Group: 010A Hazard:
29 CFR 1926.62(d)(2)(v)(E): Until the employer performed an employee exposure assessment as required under 29 CFR 1926.62(d) and determined actual employee exposure, the employer did not provide to employees performing cutting and torch burning with biological monitoring in accordance with 1926.62(j)(1)(i), to consist of blood sampling and analysis for lead and zinc protoporphyrin levels: (a) River Station Demolition Project, Downingtown, PA - On or about 1/17/18, the employer did not provide, as an interim control, employees with biological monitoring for exposure to lead, exposing employees to chemical hazards.