Violation Detail
Standard Cited: 19100303 B02 General.
Inspection Nr: 1208858.015
Citation: 01010A
Citation Type: Serious
Abatement Date: 09/01/2018 2
Initial Penalty: $7,243.00
Current Penalty: $12,675.00
Issuance Date: 07/13/2017
Nr Instances: 1
Nr Exposed: 10
Related Event Code (REC):
Gravity: 5
Report ID: 0521400
Contest Date: 08/07/2017
Final Order: 08/01/2018
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/01/2018 | $12,675.00 | 09/01/2018 | Serious | |
Penalty | C: Contested | 08/08/2017 | $7,243.00 | 07/25/2017 | Serious | |
Penalty | Z: Issued | 07/13/2017 | $7,243.00 | 07/25/2017 | Serious |
Text For Citation: 01 Item/Group: 010A Hazard:
29 CFR 1910.303(b)(2): Installation and use. Listed or labeled equipment shall be installed and used in accordance with any instructions included in the listing or labeling: On or about 08 February 2017, the employer failed to ensure that flexible power cords and re-locatable power taps were used in accordance with their listing and labeling. Two cords were "Daisy" chained together in the shipping department to power the following equipment: a. A computer work station. b. An industrial printer. c. 2 Industrial battery backup devices. This exposed employees to a fire hazard. Abatement documentation is required for this item in accordance with 29 CFR 1903.19(d).