Violation Detail
Standard Cited: 19100253 E03 II C 3 Oxygen-fuel gas welding and cutting.
Inspection Nr: 1073479.015
Citation: 01010A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,800.00
Current Penalty: $1,680.00
Issuance Date: 12/10/2015
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 01/07/2016
Gravity: 5
Report ID: 0316400
Contest Date:
Final Order: 01/11/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/11/2016 | $1,680.00 | 01/07/2016 | Serious | |
Penalty | Z: Issued | 12/10/2015 | $2,800.00 | 01/07/2016 | Serious |
Text For Citation: 01 Item/Group: 010A Hazard:
29 CFR 1910.253(e)(3)(ii)(C)(3): Flashback protection was not provided by an approved device that would prevent flame from passing into the fuel gas system: (a) Maintenance Shop: On or about June 25, 2015, and times prior, oxygen and acetylene burning torches used by employees were not provided with flash back arrestors. ABATEMENT CERTIFICATION IS REQUIRED FOR THIS ITEM