Violation Detail
Standard Cited: 19100305 G01 IV B Wiring methods, components, and equipment for general use.
Inspection Nr: 946809.015
Citation: 01010
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,100.00
Current Penalty: $1,050.00
Issuance Date: 02/28/2014
Nr Instances: 3
Nr Exposed: 9
Abatement Date: 04/02/2014
Gravity: 1
Report ID: 0626700
Contest Date:
Final Order: 03/28/2014
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 03/28/2014 | $1,050.00 | 04/02/2014 | Serious | |
Penalty | Z: Issued | 02/28/2014 | $2,100.00 | 04/02/2014 | Serious |
Text For Citation: 01 Item/Group: 010 Hazard:
29 CFR 1910.305(g)(1)(iv)(B): Flexible cords and/or cables were run through holes in walls, ceilings, or floors: In the shipping area of the site, and in the oven areas, flexible cables were run through and over ceiling tiles, exposing employees to electrical hazards.