Violation Detail
Standard Cited: 19100119 J02 Process safety management of highly hazardous chemicals.
This violation item has been deleted.
Inspection Nr: 311611081
Citation: 01010
Citation Type: Serious
Abatement Status:
Initial Penalty: $5,000.00
Current Penalty: $0.00
Issuance Date: 03/08/2010
Nr Instances: 1
Nr Exposed: 17
Abatement Date: 03/08/2010
Gravity: 10
Report ID: 0524700
Contest Date: 03/31/2010
Final Order: 09/27/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 09/27/2018 | $0.00 | Serious | ||
Penalty | Z: Issued | 03/08/2010 | $5,000.00 | Serious |
Text For Citation: 01 Item/Group: 010 Hazard: REFINERY
29 CFR 1910.119(j)(2): The employer did not establish and implement written proc edures to maintain the on-going mechanical integrity of process equipment: a.BP- Husky Refining, LLC located in Oregon, Ohio: On or about September 2009, the emp loyer's written mechanical integrity procedures did not reflect the recently ini tiated practice of changing the piping inspection interval from the thickness me asurement location (TML) level to the circuit level. In accordance with 29 CFR 1 903.19(d), abatement certification is required for this violation (using the CER TIFICATION OF CORRECTIVE ACTION WORKSHEET), and in addition, documentation demon strating that abatement is complete must be included with your certification. Th is documentation may include, but is not limited to, evidence of the purchase or repair of the equipment, photographic or video evidence of abatement, or othe r written records.t,