Violation Detail
Standard Cited: 19100333 A01 Selection and use of work practices
Inspection Nr: 1640500.015
Citation: 01010
Citation Type: Serious
Abatement Date: 06/29/2023 2
Initial Penalty: $11,162.00
Current Penalty: $11,162.00
Issuance Date: 06/09/2023
Nr Instances: 4
Nr Exposed: 20
Related Event Code (REC):
Gravity: 5
Report ID: 0524200
Contest Date: 07/05/2023
Final Order:
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | C: Contested | 07/06/2023 | $11,162.00 | 06/29/2023 | Serious | |
Penalty | Z: Issued | 06/09/2023 | $11,162.00 | 06/29/2023 | Serious |
Text For Citation: 01 Item/Group: 010 Hazard:
29 CFR 1910.333(a)(1): Live parts to which an employee may be exposed were not deenergized before the employee worked on or was near to them: a) Line B- The employer does not ensure that parts are deenergized prior to employees performing work on or near them when performing troubleshooting on the Scanico Crust Spiral Freezer E11044 (Model SF135RR150/45-18,75-18, Serial 50937-2_2016). This was observed on or about December 11, 2022. b) Line B- The employer does not ensure that parts are deenergized prior to employees performing work on or near them when performing troubleshooting on the Diamond Brick Oven E10361 (Model 1710, Serial D-170-1-001). This was observed on or about December 14, 2022. c) Line C- The employer does not ensure that parts are deenergized prior to employees performing work on or near them when performing troubleshooting on the Quantum Waterfall E10073 (Model WF5000, Serial WF50261102). This was observed on or about December 20, 2022. d) Line C- The employer does not ensure that parts are deenergized prior to employees performing work on or near them when performing troubleshooting on the Shuttleworth Smart Belt Control Panel E11148. This was observed on or about December 21, 2022.