Violation Detail
Standard Cited: 19100305 A02 IX Wiring methods, components, and equipment for general use.
Inspection Nr: 1601123.015
Citation: 01010
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,153.00
Current Penalty: $3,791.00
Issuance Date: 10/07/2022
Nr Instances: 4
Nr Exposed: 5
Abatement Date: 11/18/2022
Gravity: 1
Report ID: 0213900
Contest Date:
Final Order: 11/02/2022
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/02/2022 | $3,791.00 | 11/18/2022 | Serious | |
Penalty | Z: Issued | 10/07/2022 | $6,153.00 | 11/03/2022 | Serious |
Text For Citation: 01 Item/Group: 010 Hazard:
29 CFR 1910.305(a)(2)(ix): Lamps for general illumination were not protected from accidental contact or breakage by a suitable fixture or lampholder with a guard a) Fabrication Welding area: A light attached to the Sears 3/4 H.P. bench grinder was not provided with a guard to protect it from accidental contact or breakage, observed on or about 6/9/22. b) Machine shop: A light attached to the Lagun Republic milling machine was not provided with a guard to protect it from accidental contact or breakage, observed on or about 6/9/22. c) Machine shop: A light attached to the Bridgeport milling machine was not provided with a guard to protect it from accidental contact or breakage, observed on or about 6/9/22. d) Machine shop: A light attached to the Alliance milling machine was not provided with a guard to protect it from accidental contact or breakage, observed on or about 6/9/22. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM. FAILURE TO COMPLY WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 IN ACCORDANCE WITH 29 CFR 1903.19.