Violation Detail
Standard Cited: 19100304 G05 Wiring design and protection.
Inspection Nr: 1441625.015
Citation: 01010
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $6,940.00
Current Penalty: $1,850.64
Issuance Date: 02/14/2020
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 03/31/2020
Gravity: 5
Report ID: 0419400
Contest Date:
Final Order: 02/27/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/27/2020 | $1,850.64 | 03/31/2020 | Serious | |
Penalty | Z: Issued | 02/14/2020 | $6,940.00 | 03/31/2020 | Serious |
Text For Citation: 01 Item/Group: 010 Hazard:
29 CFR 1910.304(g)(5): The path to ground from circuits, equipment, and enclosures was not permanent, continuous, and effective: (a) Store room - On or about October 29, 2019 The employer failed to ensure the grounding wire for the air compressor was securely attached exposing employees to electrical hazards.