Violation Detail
Standard Cited: 19100303 G02 I General.
Inspection Nr: 1245028.015
Citation: 01010
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $5,070.00
Current Penalty: $2,711.50
Issuance Date: 12/11/2017
Nr Instances: 2
Nr Exposed: 9
Abatement Date:
Gravity: 10
Report ID: 0524200
Contest Date:
Final Order: 01/05/2018
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 01/05/2018 | $2,711.50 | Serious | ||
Penalty | Z: Issued | 12/11/2017 | $5,070.00 | Serious |
Text For Citation: 01 Item/Group: 010 Hazard:
29 CFR 1910.303(g)(2)(i): Except as elsewhere required or permitted by Subpart S of Part 1910, live parts of electric equipment operating at 50 volts or more were not guarded against accidental contact by use of approved cabinets or other forms of approved enclosures or by any of the means identified in paragraphs (A), (B), (C), and (D) of 29 CFR 1910.303(g)(2)(i): a) Line 3- On August 18, 2017, the employer failed to ensure that all live electrical parts on Line 3, including the 480 volt distributor box on the bubble, were guarded against accidental contact by approved enclosures. b) Line 7- On or about August 18, 2017, the employer failed to ensure that all live electrical parts on Line 7, including the upper level control box, were guarded against accidental contact by approved enclosures. No abatement certification or documentation is required for this item.