Standard Cited: 19261101 G08 III B Asbestos
Inspection Nr: 1222130.015
Citation: 01010
Citation Type: Serious
Abatement Date: 07/18/2017 2
Initial Penalty: $3,803.00
Current Penalty: $0.00
Issuance Date: 07/12/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC): R
Gravity: 10
Report ID: 0522000
Contest Date:
Final Order: 08/02/2017
Emphasis:
Substance: 9020
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/02/2017 | $0.00 | 07/18/2017 | Serious | |
Penalty | Z: Issued | 07/12/2017 | $3,803.00 | 07/18/2017 | Serious |
Text For Citation: 01 Item/Group: 010 Hazard:
29 CFR 1926.1101(g)(8)(iii)(B): Each panel or shingle shall be sprayed with amended water prior to removal. On March 29, 2017, employees removed chrysotile asbestos siding with hammers and pry bars where the siding panels were not sprayed with amended water prior to removal.