Violation Detail
Standard Cited: 19100254 D09 III Arc welding and cutting.
Inspection Nr: 1169144.015
Citation: 01010
Citation Type: Serious
Abatement Date: 3
Initial Penalty: $6,519.00
Current Penalty: $2,000.00
Issuance Date: 01/24/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 5
Report ID: 0626000
Contest Date:
Final Order: 02/16/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/16/2017 | $2,000.00 | Serious | ||
Penalty | Z: Issued | 01/24/2017 | $6,519.00 | Serious |
Text For Citation: 01 Item/Group: 010 Hazard:
29 CFR 1910.254(d)(9)(iii): Joining lengths of work and electrode cables by the use of connecting means did not have insulation adequate for the service conditions: On or about August 11, 2016, and times prior thereto, at this establishment, employees used arc welding equipment with joining lengths of work and electrode cables that had inadequate insulation.