Violation Detail
Standard Cited: 19100305 G01 IV A Wiring methods, components, and equipment for general use.
Inspection Nr: 1148175.015
Citation: 01010
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,700.00
Current Penalty: $1,620.00
Issuance Date: 07/27/2016
Nr Instances: 4
Nr Exposed: 16
Abatement Date: 09/13/2016
Gravity: 1
Report ID: 0112000
Contest Date:
Final Order: 08/16/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/16/2016 | $1,620.00 | 09/13/2016 | Serious | |
Penalty | Z: Issued | 07/27/2016 | $2,700.00 | 09/13/2016 | Serious |
Text For Citation: 01 Item/Group: 010 Hazard:
29 CFR 1910.305(g)(1)(iv)(A): Flexible cords and/or cables were used as a substitute for the fixed wiring of a structure: In the following locations, flexible cord was used in lieu of permanent wiring: A. Press Room: On, or about, May 16, 2016, a red extension cord was used to energize the coil stock pay-off at Press 1841. B. Mold Room: On, or about, May 25, 2016, Type SJOOW flexible cord was wired into a Sylvania panelboard and run across the ceiling of the work area and into a crawlspace. C. Dial Print Area: On, or about, July 8, 2016, flexible cord was used to energize two power taps at the Peerless stamping press. One cord was routed over ceiling tiles and another was used to energize a second power tap. D. Wire Prep, Pull Test Station: On, or about, July 8, 2016, an orange extension cord was used to energize equipment on the workbench, including a tube cutter and a light.