Violation Detail
Standard Cited: 19100219 C02 Mechanical power-transmission apparatus.
Inspection Nr: 1090999.015
Citation: 01010
Citation Type: Serious
Abatement Status: Corrected During Inspection
Initial Penalty: $2,000.00
Current Penalty: $450.00
Issuance Date: 03/08/2016
Nr Instances: 1
Nr Exposed: 2
Abatement Date:
Gravity: 5
Report ID: 0418400
Contest Date: 03/28/2016
Final Order: 09/12/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/12/2016 | $450.00 | Serious | ||
Penalty | C: Contested | 04/04/2016 | $2,000.00 | Serious | ||
Penalty | Z: Issued | 03/08/2016 | $2,000.00 | Serious |
Text For Citation: 01 Item/Group: 010 Hazard:
29 CFR 1910.219(c)(2): All exposed parts of horizontal shafting seven (7) feet or less from floor or working platform, excepting runways used exclusively for oiling, or running adjustments, were not protected by a stationary casing enclosing shafing completely: (a) Hammer Mill Area, on or about and at times preceding to September 9, 2015, horizontal power shaft for hammer mill was not enclosed, exposing employees to amputation hazards.