Violation Detail
Standard Cited: 19100147 C04 II The control of hazardous energy (lockout/tagout).
Inspection Nr: 1059368.015
Citation: 01010
Citation Type: Serious
Abatement Status: Not Completed - AD Discretion
Initial Penalty: $5,000.00
Current Penalty: $2,500.00
Issuance Date: 09/22/2015
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 07/15/2016
Gravity: 5
Report ID: 0213900
Contest Date: 10/14/2015
Final Order: 06/03/2016
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | J: ALJ Decision | 06/03/2016 | $2,500.00 | 07/15/2016 | Serious | |
Penalty | C: Contested | 10/19/2015 | $5,000.00 | 10/14/2015 | Serious | |
Penalty | Z: Issued | 09/22/2015 | $5,000.00 | 10/14/2015 | Serious |
Text For Citation: 01 Item/Group: 010 Hazard:
29 CFR 1910.147(c)(4)(ii): Procedures did not clearly and specifically outline the scope, purpose, authorization, rules, and techniques to be utilized for the control of hazardous energy, and the means to enforce compliance including, but not limited to, 29 CFR 1910.147(c)(4)(ii)(A), (c)(4)(ii)(B), (c)(4)(ii)(C) and (c)(4)(ii)(D): a)9000 River Rd, Delair, NJ- Building 6 Sutton 3 Press: A specific energy control procedure was not documented to be utilized for maintenance to shut down the Sutton 3 press, occurred on or about 6/10/15. NOTE: THE EMPLOYER IS REQUIRED TO SUBMIT ABATEMENT CERTIFICATION FOR THIS ITEM, FAILURE TO DO SO WILL RESULT IN AN ADDITIONAL PENALTY OF $1000.00 AS PER 29 CFR 1903.19.