Violation Detail
Standard Cited: 19100254 D09 III Arc welding and cutting.
Inspection Nr: 1040470.015
Citation: 01010
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $2,310.00
Current Penalty: $1,848.00
Issuance Date: 08/04/2015
Nr Instances: 1
Nr Exposed: 8
Abatement Date: 08/26/2015
Gravity:
Report ID: 0729700
Contest Date: 08/26/2015
Final Order: 10/27/2016
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/27/2016 | $1,848.00 | 08/26/2015 | Other | |
Penalty | C: Contested | 08/27/2015 | $2,310.00 | 08/26/2015 | Serious | |
Penalty | Z: Issued | 08/04/2015 | $2,310.00 | 08/26/2015 | Serious |
Text For Citation: 01 Item/Group: 010 Hazard:
29 CFR 1910.254(d)(9)(iii): Cables with damaged insulation or exposed bare conductors were not replace: North Plant by the Pressure Vessel Assembly (PVA) 3 Station area - Employees were exposed to hazards in that the Lincoln Arc Welder cables were damaged, worn out, and covered by duct tape. 29 CFR 1903.19(c)(1) requires certification that the abatement of the above violation is complete.