Violation Detail
Standard Cited: 19100333 B02 II A Selection and use of work practices
Inspection Nr: 1224213.015
Citation: 01009E
Citation Type: Serious
Abatement Date: 05/16/2017 2
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 05/10/2017
Nr Instances: 1
Nr Exposed: 2
Related Event Code (REC):
Gravity: 10
Report ID: 0111700
Contest Date:
Final Order: 06/12/2017
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 06/12/2017 | $0.00 | 05/16/2017 | Serious | |
Penalty | Z: Issued | 05/10/2017 | $0.00 | 05/16/2017 | Serious |
Text For Citation: 01 Item/Group: 009E Hazard:
29 CFR 1910.333(b)(2)(ii)(A): Safe procedures for deenergizing circuits and equipment were not determined before circuits and equipment were denergized: a. Site- Employees removing light ballasts operating at 110 and 277 volts were not protected from electric shock and burns where safe procedures for deenergizing the electrical circuits feeding the light ballasts were not determined prior to the work commencing.