Violation Detail
Standard Cited: 19100119 M04 IV Process safety management of highly hazardous chemicals.
Inspection Nr: 311805519
Citation: 01009B
Citation Type: Other
Abatement Status: X
Initial Penalty:
Current Penalty:
Issuance Date: 06/30/2009
Nr Instances: 1
Nr Exposed: 30
Abatement Date: 08/02/2009
Gravity: 10
Report ID: 0317300
Contest Date: 07/21/2009
Final Order: 08/12/2010
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/12/2010 | 08/02/2009 | Other | ||
Penalty | Z: Issued | 06/30/2009 | 08/02/2009 | Serious |
Text For Citation: 01 Item/Group: 009B Hazard: REFINERY
29 CFR 1910.119(m)(4)(iv): The report prepared at the conclusion of the investigation of an incident which resulted in, or could have reasonably resulted in a catastrophic release of highly hazardous chemical in the workplace, did not include the factors that contributed to the incident: a) Unit 23 FCC: The employer did not develop an investigation report that identified the root cause(s) of an incident where a contractor incorrectly installed the protective refractory lining inside the Riser during the 2004 unit turnaround. This resulted in hot spots on the Riser that could have resulted in metal failure and a release of hydrocarbons into the air. This condition was noted on or about February 20, 2009. ABATEMENT DOCUMENTATION REQUIRED