Violation Detail
Standard Cited: 19100178 A06 Powered industrial trucks.
Inspection Nr: 1303654.015
Citation: 01009B
Citation Type: Other
Abatement Status: Abatement Completed
Initial Penalty: $0.00
Current Penalty: $0.00
Issuance Date: 07/10/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 07/30/2018
Gravity:
Report ID: 0317900
Contest Date:
Final Order: 08/01/2018
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 08/01/2018 | $0.00 | 07/30/2018 | Other | |
Penalty | Z: Issued | 07/10/2018 | $0.00 | 07/30/2018 | Serious |
Text For Citation: 01 Item/Group: 009B Hazard:
29 CFR 1910.178(a)(6): The employer did not ensure that all nameplates or markings were maintained in a legible condition: a) Atlantic Precast Concrete - On or about March 20, 2018, an employee was operating a Toyota forklift to move precast concrete water basins, which did not have a legible capacity nameplate. Abatement certification required within 10 days after abatement date. The certification shall include a statement that abatement is complete, date and method of abatement, and states that employees and their representatives were informed of this abatement.