Violation Detail
Standard Cited: 19100119 M03 Process safety management of highly hazardous chemicals.
Inspection Nr: 311805519
Citation: 01009A
Citation Type: Other
Abatement Status: X
Initial Penalty: $5,000.00
Current Penalty: $1,000.00
Issuance Date: 06/30/2009
Nr Instances: 1
Nr Exposed: 30
Abatement Date: 08/02/2009
Gravity: 10
Report ID: 0317300
Contest Date: 07/21/2009
Final Order: 08/12/2010
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 08/12/2010 | $1,000.00 | 08/02/2009 | Other | |
Penalty | Z: Issued | 06/30/2009 | $5,000.00 | 08/02/2009 | Serious |
Text For Citation: 01 Item/Group: 009A Hazard: REFINERY
29 CFR 1910.119(m)(3): The incident investigation team did not consist of at least one person knowledgeable in the process involved, including a contract employee if the incident involved work of the contractor, and other persons with appropriate knowledge and experience to thoroughly investigate and analyze the incident: a) Unit 23 FCC: The employer did not develop an incident investigation team that included a contractor employee when the incident involved the work of the contractor. An incident occurred where a contractor incorrectly installed the protective refractory lining inside the Riser during the 2004 unit turnaround. This resulted in hot spots on the Riser that could have resulted in metal failure and a release of hydrocarbons into the air. This condition was noted on or about February 20, 2009. ABATEMENT DOCUMENTATION REQUIRED