Violation Detail
Standard Cited: 19261101 K01 II Asbestos
Inspection Nr: 1794910.015
Citation: 01009A
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $4,729.00
Current Penalty: $2,400.00
Issuance Date: 06/11/2025
Nr Instances: 1
Nr Exposed: 4
Abatement Date: 07/18/2025
Gravity: 5
Report ID: 0521400
Contest Date:
Final Order: 07/14/2025
Related Event Code (REC): C
Emphasis:
Substance: 9020
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 07/14/2025 | $2,400.00 | 07/18/2025 | Serious | |
Penalty | Z: Issued | 06/11/2025 | $4,729.00 | 07/18/2025 | Serious |
Text For Citation: 01 Item/Group: 009A Hazard:
29 CFR 1926.1101(k)(1)(ii): The employer did not include asbestos in the program established to comply with the Hazard Communication Standard (HCS) and ensure each employee was trained in accordance with the provisions of the HCS and paragraphs (k)(9) and (10) of this section. The employer did not provide information on at least the following hazards: Cancer and lung effects. (a) Former Hotel Property at 677 Roosevelt Road, Glen Ellyn, IL 60137 - On or about December 20th, 2024, Concrete Construction Company did not provide employees with hazard communication training on asbestos, offering information on at least the following hazards: Cancer and lung effects of asbestos. Employees were exposed to asbestos during demolition and subsequent removal of floor tile, sheet vinyl, mastic, window glazing, and duct material, which contained up to 60% chrysotile asbestos. Abatement documentation is required for this item in accordance with the requirements of 29 CFR 1903.19(d).