Violation Detail
Standard Cited: 19261205 A
Inspection Nr: 1760193.015
Citation: 01009A
Citation Type: Serious
Abatement Status:
Initial Penalty: $11,292.00
Current Penalty: $21,764.75
Issuance Date: 12/20/2024
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/24/2025
Gravity: 10
Report ID: 0728500
Contest Date: 01/21/2025
Final Order: 10/14/2025
Related Event Code (REC):
Emphasis:
Substance: 1480
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 10/14/2025 | $21,764.75 | 11/24/2025 | Serious | |
Penalty | C: Contested | 01/22/2025 | $11,292.00 | 01/17/2025 | Serious | |
Penalty | Z: Issued | 12/20/2024 | $11,292.00 | 01/17/2025 | Serious |
Text For Citation: 01 Item/Group: 009A Hazard:
29 CFR 1926.1205(a): Before entry was authorized, the employer did not document the completion of measures required by paragraph 1926.1204(c) of this standard by preparing an entry permit: On or about July 8, 2024, at job site located at 9220 Old Santa Fe Road, in Kansas City, MO, the employer failed ensure an entry permit was completed prior to the required entry of an employee inside a permit space to conduct preparatory activities prior to invert installation.