Violation Detail
Standard Cited: 19261101 K09 III Asbestos
This violation item has been deleted.
Inspection Nr: 1719781.015
Citation: 01009A
Citation Type: Serious
Abatement Status:
Initial Penalty: $16,131.00
Current Penalty: $0.00
Issuance Date: 04/24/2024
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 06/11/2024
Gravity: 10
Report ID: 0112000
Contest Date: 05/07/2024
Final Order: 09/20/2024
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 09/20/2024 | $0.00 | 06/11/2024 | Serious | |
Penalty | C: Contested | 05/10/2024 | $16,131.00 | 06/11/2024 | Serious | |
Penalty | Z: Issued | 04/24/2024 | $16,131.00 | 06/11/2024 | Serious |
Text For Citation: 01 Item/Group: 009A Hazard:
29 CFR 1926.1101(k)(9)(iii): Training for Class I operations and for Class II operations that require the use of critical barriers and/or negative pressure enclosures, was not equivalent in curriculum, training method and length to the EPA Model Accreditation Plan (MAP) asbestos abatement workers training: Decommissioned Millstone Power Station Unit No. 1 Roof: On or about October 24, 2023, and sometime thereafter, employees who demolished Unit 1 rooftop structures, where ACM; surfacing material; and/or PACM was removed, did not have the appropriate training for Class I and Class II operations that required the use of critical barriers and/or negative pressure enclosures that should be equivalent in curriculum, training method, and length to the EPA Model Accreditation Plan (MAP) asbestos abatement workers training.