Violation Detail
Standard Cited: 19260451 B01 General requirements.
Inspection Nr: 1627063.015
Citation: 01009A
Citation Type: Serious
Abatement Status: Not Completed - Worksite Changed
Initial Penalty: $5,156.00
Current Penalty: $5,156.00
Issuance Date: 01/27/2023
Nr Instances: 2
Nr Exposed: 2
Abatement Date: 02/23/2023
Gravity: 10
Report ID: 0627100
Contest Date:
Final Order: 02/27/2023
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 02/27/2023 | $5,156.00 | 02/23/2023 | Serious | |
Penalty | Z: Issued | 01/27/2023 | $5,156.00 | 02/23/2023 | Serious |
Text For Citation: 01 Item/Group: 009A Hazard:
29 CFR 1926.451(b)(1): Each platform on all working levels of scaffolds was not fully planked or decked between the front uprights and the guardrail supports: a) On or about October 8, 2022, at front of the house an employee was performing residential construction activities while working on job-made scaffold that was not fully decked or planked. b) On or about October 8, 2022, at back of the house an employee was performing residential construction activities while working on job-made scaffold that was not fully decked or planked.