Violation Detail
Standard Cited: 19100303 B01 General.
Inspection Nr: 1565455.015
Citation: 01009A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $2,486.00
Current Penalty: $1,740.20
Issuance Date: 05/16/2022
Nr Instances: 5
Nr Exposed: 5
Abatement Date: 05/26/2022
Gravity: 5
Report ID: 0215800
Contest Date:
Final Order: 07/28/2022
Related Event Code (REC):
Emphasis:
| Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
|---|---|---|---|---|---|---|
| Penalty | I: Informal Settlement | 07/28/2022 | $1,740.20 | 05/26/2022 | Serious | |
| Penalty | Z: Issued | 05/16/2022 | $2,486.00 | 05/26/2022 | Serious |
Text For Citation: 01 Item/Group: 009A Hazard:
29 CFR 1910.303(b)(1): Electrical equipment was not free from recognized hazards that were likely to cause death or serious physical harm to employees: a) At the Zerand Cutting and Creasing line, on or about 11/18/2021: A junction box did not have a cover to enclose live parts. b) At the Zerand Cutting and Creasing line, on or about 11/18/2021: Control boxes were not used per listing and label as the knockouts were removed and not sealed. c) At the Zerand Cutting and Creasing line, on or about 11/18/2021: Spliced wires were not protected by a junction box. d) At the Zerand Cutting and Creasing line, on or about 11/18/2021: Wires from the control boxes were not installed with strain relief, nor enclosed in conduit. e) At the Zerand Cutting and Creasing line, on or about 11/18/2021: Wires were used without secondary insulation.