Standard Cited: 19100179 J02 Overhead and gantry cranes.
Inspection Nr: 1482240.015
Citation: 01009A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $10,390.00
Current Penalty: $7,000.00
Issuance Date: 12/28/2020
Nr Instances: 1
Nr Exposed: 10
Abatement Date: 07/22/2022
Gravity: 10
Report ID: 0522000
Contest Date: 01/22/2021
Final Order: 06/22/2022
Related Event Code (REC): C
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 06/22/2022 | $7,000.00 | 07/22/2022 | Serious | |
Penalty | C: Contested | 01/26/2021 | $10,390.00 | 02/16/2021 | Serious | |
Penalty | Z: Issued | 12/28/2020 | $10,390.00 | 02/16/2021 | Serious |
Text For Citation: 01 Item/Group: 009A Hazard:
29 CFR 1910.179(j)(2): Frequent inspection. The following items shall be inspected for defects at intervals as defined in paragraph (j)(1)(ii) of this section or as specifically indicated, including observation during operation for any defects which might appear between regular inspections. All deficiencies such as listed shall be carefully examined and determination made as to whether they constitute a safety hazard: a) On or about August 31, 2020, the employer had not ensured that frequent inspections had been performed on the 25 ton Delta overhead cranes. b) On or about August 31, 2020, the employer had not ensured that frequent inspections had been performed on the 10 ton Lilly overhead cranes. c) On or about August 31, 2020, the employer had not ensured that frequent inspections had been performed on the 10 ton P&H overhead cranes.