Violation Detail
Standard Cited: 19100219 D01 Mechanical power-transmission apparatus.
Inspection Nr: 1358712.015
Citation: 01009A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $9,472.00
Current Penalty: $5,000.00
Issuance Date: 05/01/2019
Nr Instances: 2
Nr Exposed: 5
Abatement Date: 05/21/2019
Gravity: 5
Report ID: 0625400
Contest Date: 05/24/2019
Final Order: 01/02/2020
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | F: Formal Settlement | 01/02/2020 | $5,000.00 | 05/21/2019 | Serious | |
Penalty | C: Contested | 06/03/2019 | $9,472.00 | 05/21/2019 | Serious | |
Penalty | Z: Issued | 05/01/2019 | $9,472.00 | 05/21/2019 | Serious |
Text For Citation: 01 Item/Group: 009A Hazard:
29 CFR 1910.219(d)(1): Pulley(s) with part(s) seven feet or less from the floor or work platform were not guarded in accordance with the requirements specified in 29 CFR 1910.219(m) and (o): On or about November 7, 2018, in the engine room, the rotating pulleys on the compressors were not guarded. Employee(s) exposed to a caught-in hazard from the rotating pulley on the compressors. 1. Compressor #1, Vilter compressor R33740, the rotating pulley was not guarded. The guard was missing on the back. 2. Compressor #3, Mycom compressor the rotating pulley was not guarded. The guard was missing on the back.