Violation Detail
Standard Cited: 19100303 G01 II General.
Inspection Nr: 1313616.015
Citation: 01009A
Citation Type: Serious
Abatement Status: Abatement Completed
Initial Penalty: $4,434.00
Current Penalty: $2,663.00
Issuance Date: 10/24/2018
Nr Instances: 1
Nr Exposed: 1
Abatement Date: 11/02/2018
Gravity: 5
Report ID: 0523900
Contest Date:
Final Order: 11/07/2018
Related Event Code (REC):
Emphasis:
Type | Latest Event | Event Date | Penalty | Abatement Due Date | Citation Type | Failure to Abate Inspection |
---|---|---|---|---|---|---|
Penalty | I: Informal Settlement | 11/07/2018 | $2,663.00 | 11/02/2018 | Serious | |
Penalty | Z: Issued | 10/24/2018 | $4,434.00 | 11/02/2018 | Serious |
Text For Citation: 01 Item/Group: 009A Hazard:
29 CFR 1910.303(g)(1)(ii): The required working space about electric equipment rated 600 volts, nominal, or less to ground, was used for storage: (a) Sawmill near edger and electrical panels C and D; Materials were stored directly beneath electrical service panels and on top of electrical transformers.